Deeper Inside Malartic Gold Deposit Mining Process

Gold road reported a maiden mineral resource for the gruyere gold deposit in august 2014 based on approximately 38,000 metres of resource drilling.By that stage the deposit had been delineated over a strike.Further value engineering on the mining and process plant during the design and engineering phase.