2 6 13m Cement Mill Grading

Current activity is completion of pressure testing of casing in order to drill ahead in vertical 6 12 hole to final lower hollywood sands objective and thence to total well measured depth of 13,567 feet measured depth.13m at 1.01 copper and 1.60gt gold including 5m at 1.24.During the week, a second cement plug was set to.