Buzwagi Buzwagi Gold Mine 13 02 E5

The pea mine design assumes a mine life of 34 years which completely exhausts the low grade stockpiled material.However, the pea economic model assumes a 30 year life which results in 11.16 mt low grade mined mineralization remaining in a stockpile.Over the 34-y mine life, an estimated 4.77 mt of overburden will be removed from the pit area.